  钢结构的应用领域以及技术的进步和社会经济的发展,许多市场在不断发展,市场的需求也越来越广泛,但也在关注,所以我们要做好工作,是防患于未然的钢结构组件的加工技术。那么在制作钢结构的过程中应该注意些什么呢?
  With the application of steel structure and the progress of technology and the development of social economy, many markets are developing continuously, and the demand of the market is more and more extensive. But we are also concerned about safety. So we should do a good job of safety. The first is the processing technology of steel structure components which can prevent accidents in the future. So what should we pay attention to in the process of making steel structure?
  储存的钢铁
  Stored steel
  钢结构的贮存要求尽量减少钢的变形和腐蚀,使钢节堆放时尽量向后或向外,有利于排水。在正式入库前进行严格的检验,检验合格后方可办理入库手续。
  The storage requirement of steel structure is to minimize the deformation and corrosion of steel, so that the steel knots can be stacked backward or outward as far as possible, which is conducive to drainage. Strict inspection shall be carried out before formal storage, and the warehousing formalities shall be handled only after the inspection is qualified.
  钢结构加工要点
  Key Points of Steel Structure Processing
  1. 必须按照加工工艺流程进行。有隐蔽焊缝时,必须焊接后方可合格;
  1. Processing process must be followed. When there are concealed welds, they must be welded before they are qualified.
  2. 装配时行小零件的装配,再进行大零件的装配,纠正后再进行装配,防止大零件变形;
  2. Small parts are assembled first, then large parts are assembled. After correction, large parts are assembled to prevent deformation.
济南彩钢板房出租
  3.装配零件时,应检查零件是否合格,并在30-50mm范围内边缘油渍和污垢;
  3. When assembling parts, check whether the parts are qualified and remove grease stains and dirt from the edges within 30-50 mm.
  4、在装配轮胎时,必须考虑预释放焊后的收缩和加工余量;
  4. When assembling tires, the shrinkage and processing allowance after pre-release welding must be considered.
  5、钢结构在生产过程中应将顶部密件抛光,使其接触面达到75%;
  5. In the process of production, steel structure should polish the top part to make its contact surface reach 75%.
  6、加工零件要编号,写清图号、零件号等便于查找;
  6. Processing parts should be numbered, and drawing numbers and parts numbers should be clearly written for easy searching.
  7. 板件和型材的装配和焊接也要按顺序进行,如零件的隐蔽部位要提前喷漆。
  7. The assembly and welding of sheets and profiles should also be carried out in sequence, such as painting the concealed parts in advance.
  因此,在钢结构加工过程中,必须严格执行各种工艺和步骤,才能生产出合格的钢结构构件。
  Therefore, in the process of steel structure processing, it is necessary to strictly implement various processes and steps in order to produce qualified steel structure components.